MUGA sportcomplex
Sport - MUGA, a program for the construction of school sports facilities throughout Poland.
- Year
- 2022
- Location
- Gdynia, Katowice, Chodzież, Nidzica, Nysa - Poland
- Water capacity
- 2500m2
Showcase
Take a closer look at these projects:
A program for the construction of school sports facilities throughout Poland.
We place a high priority on creating solutions that meet the best sustainability standards.
Solution
Sports pitch System Synthetic Turf

The Permavoid system is used as a multifunctional subbase for synthetic turf pitches, being both high-strength and lightweight. Due to the open surface of the Permavoid units the pitch drains effectively and reliably over the entire surface, preventing standing water after peak rain events. The shallow construction depth speeds up the installation process, reduces material movements to and from site and the cellular reusable set up allows the creation of temporary and permanent sports pitches.
With an approved conventional shockpad the system is used as a system for rainwater capture, detention and/or infiltration. The Nature-based functionality of rainwater retention and capillary evaporation for adiabatic cooling of the pitch can be created using the BlueLay capillary shockpad in combination with an open-grid backing synthetic turf and natural sand infill.
Permavoid and synthetic turf create a water sensitive and climate resilient solution; playable 24/7, cool and safe for athletes, with limited maintenance and water consumption, based on on-site circular water management.