Permavoid
Smart with water

The football pitch at Anfield had been in place for 15 years but the drainage and irrigation system had been in place since 1998. A change was long overdue. Liverpool FC sought the most advanced system to meet the requirements for a world class premier league team.

Liverpool stadium Anfield

Liverpool stadium Anfield

Project information

We installed this innovative under pitch drainage and air blanket system which comprised a layer of 85 Permavoid units, laid on a welded reinforced impermeable membrane, protected by a heavy-duty geotextile. The Permavoid units provide a void through which surface water can rapidly drain and air can be blown through for soil aeration.

Location
Liverpool, United Kingdom
Year
2017
Project timeline
1 year
Water capacity
684000
Litres
Partner(s)
Permavoid
Solutions
Sport pitches

Distributors who worked on this project

Discover all distributors

Get inspired by these projects