The football pitch at Anfield had been in place for 15 years but the drainage and irrigation system had been in place since 1998. A change was long overdue. Liverpool FC sought the most advanced system to meet the requirements for a world class premier league team.
Liverpool stadium Anfield
Liverpool stadium Anfield
Project information
We installed this innovative under pitch drainage and air blanket system which comprised a layer of 85 Permavoid units, laid on a welded reinforced impermeable membrane, protected by a heavy-duty geotextile. The Permavoid units provide a void through which surface water can rapidly drain and air can be blown through for soil aeration.
Distributors who worked on this project
Discover all distributors
Products used in this project
Discover all products